There's not much more to add at this point but photos of the walls. They continue to get taller and are still straight as can be! The second pour is a couple of days out.
| Nacho lifting block over rebar |
| bending steel to allign with blocks. This is a junction of Faswall to CMU block wall from basement |
| Ponch on entry wall |
| bedroom wing (single story) |
| living room and bedroom wing from backyard walls are at about 10ft |